Home
10 Easy-to-Build Practical Project Plans
Lee Valley
Loading Inventory...
10 Easy-to-Build Practical Project Plans
From Lee Valley
Current price: $19.95

Lee Valley
10 Easy-to-Build Practical Project Plans
From Lee Valley
Current price: $19.95
Loading Inventory...
*Product information may vary - to confirm product availability, pricing, shipping and return information please contact Lee Valley
These plans are a great way to introduce the younger generation to woodworking. The step-by-step visual instructions are easy to follow, even if you have no woodworking experience. Each plan lists the tools and materials required and includes measured cutting diagrams. Helpful definitions of woodworking terms are provided throughout, along with suggestions for customizing the projects. Printed in full color on water- and rip-proof synthetic paper, the 11" × 17" plans are spiral bound in a booklet, with a loop for hanging them in sight of your workbench.
These plans are a great way to introduce the younger generation to woodworking. The step-by-step visual instructions are easy to follow, even if you have no woodworking experience. Each plan lists the tools and materials required and includes measured cutting diagrams. Helpful definitions of woodworking terms are provided throughout, along with suggestions for customizing the projects. Printed in full color on water- and rip-proof synthetic paper, the 11" × 17" plans are spiral bound in a booklet, with a loop for hanging them in sight of your workbench.

























